Petrocity Energy is a limited liability company incorporated in 2010 in Kenya, with corporate head office in Mombasa. Terminal is located in Konza neighboring Kenya Pipeline Pump Station Number 8.
PETROCITY ENERGY
Tank Farm
Total Capacity : 72 million litres.
:AGO :40 million litres.
: PMS : 28 million litres.
: IK : 4 million litres
Truck Loading
Truck Loading
Petrocity have 12 loading bays each delivering product at 1200(L) per minute. A 30000(L) truck loading can be completed in 30 minutes at the gantry.
Custody Receipts
Product Custody Transfer from KPC
Metering area for product custody transfer from KPC main line. Petrocity can receive at a speed of 1000 m3 per hour with the latest commissioned UFM meters from KPC line 5.
Connection to KPC
Connection to KPC
Petrocity is directly connected to the KPC Line 1 and Line 5 at PS8.